CPT Fireground Photos

Fire Photography By Chris Torello

  • Home
  • Browse Photo Galleries
  • Search
  • Home
  • Browse
  • Search

Allendale House Drill 3-3-16

Allendale Vacant House 4 part DRILL March 3, 7, 8, 9, 10 2016
1st night was ground ladder placement , Talk on roof construction and roof operations .
Last part of the night was a discussion and hands on about wall breaching if you became trapped in a room.
2nd Night was a rolling response and was filled with smoke. No Photos UNAVAILABLE.
3rd night the scenario was a firefighter went through a floor and was trapped and no way to get them out from below. Using a hose line to pull the FF up and out. Team work.
4th Night Fas Team , RIT , RIC Work
Breaching the exterior wall / making windows into door ways to get the FF out.
2nd pt. of the night was a discussion & hands on roof operations and venting what ladders , tools & equipment will you need.
5th Night Ladder truck placement , roof / gable operations and cutting square vs triangle holes in a roof. the last part of the night some of the guys were pump training on the engine and deck gun operations.
There are 10 video clips included
Read More
  • IMG_1512

    IMG_1512

  • IMG_1514

    IMG_1514

  • IMG_1515

    IMG_1515

  • IMG_1517

    IMG_1517

  • IMG_1519

    IMG_1519

  • IMG_1529

    IMG_1529

  • IMG_1533

    IMG_1533

  • IMG_1538

    IMG_1538

  • IMG_1542

    IMG_1542

  • IMG_1544

    IMG_1544

  • IMG_1545

    IMG_1545

  • IMG_1547

    IMG_1547

  • IMG_1548

    IMG_1548

  • IMG_1549

    IMG_1549

  • IMG_1550

    IMG_1550

  • IMG_1551

    IMG_1551

  • IMG_1552

    IMG_1552

  • IMG_1556

    IMG_1556

  • IMG_1558

    IMG_1558

  • IMG_1559

    IMG_1559

  • IMG_1561

    IMG_1561

  • IMG_1563

    IMG_1563

  • Photo Sharing
  • About SmugMug
  • Browse Photos
  • Prints & Gifts
  • Terms
  • Privacy
  • Contact
  • Owner Log In
© 2022 SmugMug, Inc.
    IMG_1517.JPG
    IMG_1519.JPG
    IMG_1529.JPG